CENTRAGRID - PHASE 2
Scaling a Sustainable Energy Solution

In September 2024, Centragrid achieved a monumental milestone with the completion of Phase 2 of our solar energy project. This strategic expansion represents a significant stride in the countrie’s renewable energy landscape, demonstrating our commitment to sustainable development, technological innovation, and national energy security.

Technological Innovation at the Core
Phase 2 embodies our mission to expand our energy infrastructure, building upon the success of our initial Plant.
Panel Technology
High-efficiency mono-crystalline bi-facial solar panels
Single Axis Tracker - E to W
In-line independent slew drive tracking system
Transmission
4.5km - 88/132kV Double Circuit Transmission Solution cutting Norton - Mazowe feeder
Installed Capacity & Production
23 Megawatts Capacity, producing Estimated 36,800 MWh of clean, renewable electricity
Impact
Powering approximately 17,250 average Zimbabwean households annually
Carbon Emissions Saved
equivalent to 24,150 metric tons of CO2, saved per year. Preserving around 1,600 acres of forest

2024

Year Commissioned

36800

MWh Produced

17250

Houses Powered

24150

Kt CO2 avoided
Efficiency & Production Improvements
Phase 2 builds on the advancements in photovoltaic (PV) technology, improving solar plant efficiency and power production.
Bifacial Solar Panels
Increased energy generation efficiency (up to 30% more than traditional panels)
Enhanced performance in diverse environmental conditions
Reduced land footprint for equivalent energy production
Single-Axis Tracking System
In - line tracker slew drive ensures string level Intelligent solar tracking system that precisely follows the sun's arc, dramatically boosting panel energy capture, minimizing shading and overall system performance.
88/132kV Substation
Enables seamless power transmission
Enhances grid stability
Supports large-scale renewable energy integration
Meets international power transmission standards
Phase 2 - Construction
Our Strong Partner Network
Phase 2 - Construction
Our Journey in Images
SCROLL UP